Water Transmission System Improvements
Project Cost: $536,509.00
Replacement of 1640 linear foot of 8” water main and 800 linear foot of 6” water main along with fire hydrants and other valves. Installation of the water main also included directional boring, open trench construction, seed and mulch, grading, miscellaneous asphalt paving and concrete work. The project also included refurbishment of a 100,000 gallon elevated water tank and a 10,000 gallon hydrostatic tank along with installation of all new electrical control panels at each well site.