Water Transmission System Improvements

Posted July 6, 2021

Replacement of 1640 linear foot of 8” water main and 800 linear foot of 6” water main along with fire hydrants and other valves. Installation of the water main also included directional boring, open trench construction, seed and mulch, grading, miscellaneous asphalt paving and concrete work.  The project also included refurbishment of a 100,000 gallon elevated water tank and a 10,000 gallon hydrostatic tank along with installation of all new electrical control panels at each well site.

Indefinite-Delivery-Indefinite-Quantity (IDIQ)

Posted June 9, 2021

Task based assignments with an emphasis on electrical including UEM, utilities and electrical maintenance to include overhead and underground primary, switchgear and transformer distribution systems.  Secondary services from the transformer distribution to individual facilities, switchgears, panel boards, surge suppression, power quality metering, and all associated branch circuitry.  Also encompasses all general construction under NAICS 236220.  These general construction services include roofing, exterior and interior structural renovations, exterior weatherproofing, interior painting and coatings, exterior and interior plumbing, cabinetry, casework, floor coverings, window replacement, and acoustic treatments.  Renovation tasks also include freestanding and modular furnishings.

Tri-County Airport Hangars and Taxiway

Posted January 14, 2020

Construction of one 5 unit OSI box hanger (8640 SF) and one 4 unit OSI box hanger (8160 SF), site work included grading, drainage, retention pond, erosion control, paved parking lot, concrete sidewalks, concrete headwalls, concrete spillways, sodding, reflective markings, painted striping and markings, airfield lighting, paved access taxiway and parking apron.

Tri-County Airport/Windsock Segmented Circle and Parking Apron Expansion

Posted January 14, 2020

This project consisted of construction of new windsock and segmented circle, and expansion of parking apron. Project included milling and resurfacing asphalt pavement, erosion control, minor drainage improvements, and relocation of airfield lighting, additional airfield lighting, concrete construction of segmented circle, windsock, and solar safety lighting.

Tyndall Air Force Base Water Main Replacement

Posted January 14, 2020

This project consists of replacing 5300 linear foot of 12” water main along with fire hydrants and other valves. This project also included directional boring, open trench construction, seed and mulch, grading and miscellaneous asphalt paving and concrete work.

The Baptist College of Florida Hangars and Taxiway

Posted January 14, 2020

In the realm of construction projects like the one described above, meticulous planning and execution are paramount. Just as precision is crucial in laying down concrete sidewalks and constructing OSI box hangers, it is equally important to approach legal matters with the same level of attention.

In some cases, individuals may find themselves entangled in commitments that require careful consideration and resolution. Just as construction projects demand skilled management, navigating through agreements such as timeshare contracts requires expertise. This parallels the need for a thorough and professional approach in both the physical construction realm and the legal domain.

When faced with the complexities of a timeshare agreement, individuals may seek assistance in the form of a pueblo bonito timeshare cancellation. Much like the coordination needed for airfield lighting or the alignment of painted striping, canceling a timeshare involves a methodical process. Seeking professional help for timeshare cancellation is akin to engaging experts to oversee the intricacies of construction projects, ensuring a smooth and legally sound resolution.

Just as every aspect of the construction project contributes to its successful completion, addressing the legal aspects of a timeshare cancellation requires a comprehensive approach. By incorporating the keyword “pueblo bonito timeshare cancellation” seamlessly into the narrative, we emphasize the importance of precision not only in construction projects but also in legal matters, creating a harmonious connection between the two.

Tri-County Airport/FAA Runway Painted Striping & Marking and Game Fence

Posted January 14, 2020

This project consisted of the construction of new markings and striping on the existing runway and airfield as well as the installation of 6400 linear feet 8’ high new Wildlife Game Proof Fence.  This included hydro blasting existing markings and replacing with new markings.

City of Marianna Airport/ FAA Taxiway Extension and Airfield Lighting

Posted January 14, 2020

This project consisted of the construction of 950 linear feet of taxiway extension along with airfield lighting. Other improvements included site work, milling and resurfacing asphalt pavement, drainage, airfield signage, and required airfield markings.

The Baptist College of Florida Wellness Center

Posted January 14, 2020

Renovation of existing gymnasium which included the addition of a 4000 sq. ft  split face block fitness facility, 2nd story installation of a 7’ wide cantilevered concrete walkway with metal safety rail, demolition of 2nd floor concrete to accommodate the racquet room addition, construction of 800 sq. ft vestibule with glazing, split faced block, stucco, and brick. Other upgrades include HVAC, flooring, electrical and drainage.     

West Point Home Renovations

Posted January 14, 2020

Construction of 240 linear feet of 32’ high partition wall, relocation of HVAC and air duct, concrete wall demolition, installation of new dock seals, and sealing of concrete wall joints.

ADDRESS:
2902 Madison Street
Marianna, FL 32446

PHONE:
850-372-4126